Answers are grounded in this paper and cite their sources.
The allocation of personnel and lift (elevator) maintenance route planning rely heavily on manual scheduling, leading to unbalanced workloads. Therefore, a route planning method for lift maintenance is proposed. Task precedence and multiple maintenance stations are considered from the perspective of workload balance. First, a multi-objective optimization model considering task precedence and multiple maintenance stations is established, with the objective of minimizing the total maintenance distance, total number of tasks assigned to maintenance personnel and standard deviation of the working time of each person. Then, an improved parallel two-population multi-objective genetic algorithm (IP-NSGA-II) is developed to solve the constructed model. Finally, the decomposition method is compared with the global method. The results show that the decomposition method is better than the global method under the same iteration number, and that IP-NSGA-II is better than the non-dominated sorting genetic algorithm-II (NSGA-II). The proposed method provides a valuable reference for planning lift maintenance routes.
No takes yet. Share an insight, caveat, or question.
Wei et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: