Answers are grounded in this paper and cite their sources.
A short-term hydrothermal scheduling approach is presented for predominantly hydroelectric systems. The model takes into account both the operating hydroelectric system and the electric transmission network constraints. The model consists of a simulation of the hydraulic system with the discharge decisions given by an optimal DC power flow algorithm. The release targets of the reservoirs, established by long-term operational planning, are enforced by a dual Lagrangean approach that fixes a penalty for the use of water in the reservoirs. Two illustrative examples have been solved in order to evaluate the efficiency of the approach.>
No takes yet. Share an insight, caveat, or question.
Ohishi et al. (1991) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: