This is the authors' abstract. We don't add key points for this paper.
The warm front end of the PIP2IT accelerator, assembled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H⁻ ion source, a 2-m long Low Energy Beam Transport (LEBT) line, a 2.1-MeV, 162.5 MHz CW RFQ, followed by a 10-m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation in regimes where the average beam power in this front end emulates the operation of the proposed PIP-II accelerator, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encountered and some of the solutions that were implemented.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Shemyakin et al. (2019) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: