Examines economic impacts of curtailment on a solar farm in Poland, indicating critical planning needs.
The rapid expansion of photovoltaic capacity in Poland has exposed distribution-grid constraints and increased the incidence of non-market curtailment. This paper examines a 1 MW ground-mounted photovoltaic plant in Zalesie, north-eastern Poland, using complete documentation. The study combines a spatial multi-criteria site-suitability assessment based on the Weighted Sum Model, a sensitivity analysis of criteria weights, an analysis of 28 curtailment compensation applications, and a transparently parameterised LCOE/NPV/IRR model under four curtailment-severity scenarios. The results indicate a high and weight-robust site-suitability score (S = 4.45/5.00; sensitivity range 4.35–4.55), with curtailment concentrated in spring: 68% in April and May. Economic modelling shows that, under merchant market conditions and without support schemes, profitability is already constrained in the baseline case (IRR 4.2–6.4%), while increasing the share of unsold energy from 0% to 10% raises LCOE by approximately 3–11% and deepens the already negative NPV by a further PLN 0.09–0.36 million. A Monte Carlo simulation confirms that the NPV stays negative across the whole plausible parameter range. This case study demonstrates that classical spatial suitability may be a necessary but insufficient condition for the economic security of PV investments unless grid-related and regulatory risks are incorporated into the planning stage.
No takes yet. Share an insight, caveat, or question.
Kryszk et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: