Answers are grounded in this paper and cite their sources.
Energy-efficient production scheduling research has received much attention because of the massive energy consumption of the manufacturing process. In this article, we study an energy-efficient job-shop scheduling problem with sequence-dependent setup time, aiming to minimize the makespan, total tardiness and total energy consumption simultaneously. To effectively evaluate and select solutions for a multiobjective optimization problem of this nature, a novel fitness evaluation mechanism (FEM) based on fuzzy relative entropy (FRE) is developed. FRE coefficients are calculated and used to evaluate the solutions. A multiobjective optimization framework is proposed based on the FEM and an adaptive local search strategy. A hybrid multiobjective genetic algorithm is then incorporated into the proposed framework to solve the problem at hand. Extensive experiments carried out confirm that our algorithm outperforms five other well-known multiobjective algorithms in solving the problem.
No takes yet. Share an insight, caveat, or question.
He et al. (2021) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: