The software greenius which is made for fast and easy annual performance simulations of different renewable energy systems is introduced and two illustrative examples are shown. These examples are a 50 MW CSP plant and a 50 MW PV plant at the same site in Jordan. Different annual and diurnal output profiles as well as the different total electricity production despite identical nominal output are shown and discussed.