Answers are grounded in this paper and cite their sources.
The vigorous growth of cities and reduction of free territories for building construction necessitate the development of town areas with complex geotechnical conditions. The complexity of construction in such areas causes increase of construction costs and, as a result, decrease of profitability in the real estate market and occurrence of additional risks in developing the corresponding areas. In the initial stage of design, that is, in the stage of technical-and-economic assessment, there is a need to select engineering planning decisions and to adopt the corresponding arrangement of engineering protective structures in the design area. Unavailability of an algorithm for solving this problem in the initial design stage often causes a need for redesign and for development of several design variants, and as a result, for increase of design periods and for attraction of additional costs. For this purpose, it is required to analyze factors affecting selection of engineering protective structures and use of such structures in certain development areas, as well as to develop an information model for selecting engineering protective structures for specific territories.
No takes yet. Share an insight, caveat, or question.
Priymachenko et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: