Answers are grounded in this paper and cite their sources.
We extend a well-established model of reliability growth in a reliability improvement program, the Army Materiel Systems Analysis Activity Maturity Projection Model (AMPM), to include a model of the program's cost. We show how the extended model may be used to plan cost-optimal or schedule-optimal integrated programs of reliability improvement and testing, from early design through developmental and operational testing, and illustrate the process with an example from an actual program.
No takes yet. Share an insight, caveat, or question.
Lee et al. (2011) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: