Accurate knowledge of transmission system parameters, such as series impedance, optimizes distance relay settings and impedance-based fault location. A new method is developed to measure transmission line impedances and admittances from synchronized phasor measurements. Power system voltage and current phasors were recorded during commissioning tests of a 525 kV transmission system containing shunt and series compensation. Steady-state phase angles (delta) and magnitudes of line-side voltages and currents were measured relative to a satellite-based global time standard at two substations. Pairs of synchronized measurements were used to directly calculate real-time steadystate ABCD parameters. For comparison, two-port ABCD transmission system parameters were derived by classical methods and from an ElectroMagnetics Transients Program (EMTP) transmission system design model. To verify the accuracy of the measured parameters, a new method comparing field measured with calculated power flows was developed. Sending-end power flow was measured from accurate recordings and was compared with power flow calculated using the three estimates of ABCD parameters, sendingend voltages, and receiving-end voltages. Close agreement was found between field-measured power flows and calculations using the measured ABCD parameters.
No takes yet. Share an insight, caveat, or question.
Gary A. Zevenbergen Robert E. Wilson (1999) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: