Answers are grounded in this paper and cite their sources.
Effective project portfolio management requires balancing resource allocation with project scheduling to minimise costs and completion time. This study addresses the multi-mode resource-constrained multi-project scheduling problem (MRCMPSP) under uncertainty by introducing a novel event-based bi-objective mixed-integer linear programming (MILP) model. For the first time, this model integrates time-varying resource availability, considering both renewable and non-renewable resources, multiple execution options for activities, and stakeholder satisfaction. To handle real-world uncertainty, activity durations and resource consumption are modelled as interval-valued fuzzy (IVF) numbers, capturing the ambiguity inherent in project environments. A new hybrid compromise solution method, combining goal programming and fuzzy programming, is developed to solve the IVF-based multi-objective optimisation problem, offering flexible and adaptable decision-making. The proposed approach is validated through computational experiments, sensitivity analyses, and a real-world case study from the literature. The sensitivity analysis highlights the significance of accounting for time-varying resources, showing that such considerations can reduce portfolio completion time and costs by enabling concurrent task execution and better scheduling of resources, such as machine maintenance and employee availability. Comparative analysis with existing methods highlights the superior performance of the proposed model in balancing competing objectives and handling uncertainty.
No takes yet. Share an insight, caveat, or question.
Farahmand-Mehr et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: