Answers are grounded in this paper and cite their sources.
Survey identifies critical barriers to smart sustainable construction adoption affecting project delivery performance.
The adoption of smart sustainable practices is important for improving construction performance and resilience; however, their implementation in Malaysia remains constrained by barriers. This study develops a multilevel understanding of these barriers and their potential implications for project delivery performance. A survey of 101 construction professionals was analysed using descriptive statistics and exploratory factor analysis. Twenty barriers were identified, with the most critical being the lack of financial resources, the lack of standards and policies, resistance to change, lack of awareness and low market demand. Six latent dimensions emerged: organizational readiness and industry acceptance; technical capability and organizational integration barriers; institutional support deficiency; perceived risk and workforce adaptation barriers; project coordination and system integration barriers; and strategic leadership deficiency. Guided primarily by the Technology–Organization–Environment (TOE) framework, the findings were synthesized into the Smart Sustainable Construction Barriers Model (SSC-BM), linking barriers to organizational, technological and institutional constraints. The model conceptually links upstream weaknesses to downstream inefficiencies in workflow coordination, planning reliability and production control. Overall, the study provides a framework for improving smart sustainable construction adoption through a theory-informed interpretation of its implications for project delivery performance rather than empirical validation of causal relationships.
No takes yet. Share an insight, caveat, or question.
Yap et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: