Answers are grounded in this paper and cite their sources.
Power law process or Weibull process is used to model reliability growth. The reliability development of such a system often takes place by testing a system until it fails, then making repairs and design changes and testing it again. This process continues until a desired level of reliability is achieved. At various times in the development process it becomes important to assess and predict system reliability from an available set of data on system failures. We made an attempt to estimate the future reliability based on a predictive distribution. We also discuss the point and interval estimations of the parameters as well as reliability based on full likelihood and predictive likelihood. A detailed simulation along with a few examples is presented to support the developments.
No takes yet. Share an insight, caveat, or question.
Muralidharan et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: