Answers are grounded in this paper and cite their sources.
Contracts of deterministic duration are derived as solutions to a moral hazard problem in a framework that extends E. Fama's (1980) single-period labor contracts model by introducing recontracting costs and long-term contracts. A worker can be induced to put forth unobservable effort if he knows that his wages in future contracts will be related to his past overall productivity. As contract length is increased, the worker is more likely to shirk because the present value of future wage revisions associated with shirking is reduced. The optimal contract length minimizes the sum of explicit contracting costs and the costs of shirking.
No takes yet. Share an insight, caveat, or question.
Richard Cantor (1988) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: