In-pit crushing and conveying (IPCC) is emerging as a viable alternative to traditional truck-shovel haulage in open-pit mines, driven by the rising fuel cost and concerns over greenhouse gas (GHG) emissions. Effective short-term planning in open-pit mines must account for operational and equipment uncertainties. However, optimising short-term planning with IPCC integration is a relatively underexplored research area. This study addresses this gap by developing a novel simulation-optimisation framework that combines mixed-integer linear programming (MILP) and Monte Carlo simulation (MCS) to simultaneously optimise short-term production schedules and evaluate haulage system performance under uncertainty. This framework explicitly incorporates IPCC operations and their failure-related uncertainties, an aspect largely overlooked in existing short-term planning models, into the planning process. The MILP minimises haulage costs while generating schedules and meeting long-term production targets through optimal shovel allocation to mining cuts. These schedules are then input into a Monte Carlo haulage simulation model, which captures the uncertainties related to trucks, shovels, and IPCC operations. Additionally, the simulation estimates key performance indicators including maximum tonnes per gross operating hour (TPGOH) and the proximity to optimal production under uncertain conditions for both IPCC and truck-shovel scenarios. The model has been verified through a case study in an iron ore mine over a 12-month planning horizon, yielding promising results that support the adoption of semi-mobile IPCC systems over traditional truck-shovel operations.
No takes yet. Share an insight, caveat, or question.
Habib et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: