Answers are grounded in this paper and cite their sources.
The increasing penetration of renewable energy introduces significant uncertainty to the operation of energy-intensive industries. To address this challenge, we propose a multi-timescale scheduling model for wind power integration in polysilicon industrial parks. The model consists of a day-ahead component, which minimizes operational costs by coordinating polysilicon reduction and water electrolysis hydrogen production while allocating reserve capacity. A chance-constrained programming approach is employed to determine reserve capacity, ensuring a balance between reliability and economic efficiency. The intraday component, benefiting from improved wind power forecasting accuracy, engages only the water electrolysis process to absorb excess renewable generation. By involving water electrolysis in both timescales, the model enhances operational flexibility and renewable utilization. Case studies demonstrate the effectiveness of the proposed approach, highlighting its potential to support low-carbon and cost-efficient operation in polysilicon industrial parks.
No takes yet. Share an insight, caveat, or question.
Yang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: