Cohort (n=233)
Yes
Answers are grounded in this paper and cite their sources.
Timely communication with general practitioners and adequate preparation for discharge are essential to prevent postdischarge events, particularly in patients with complex needs like heart failure.
Introduction The quality of transitions from the hospital to home is critical for preventing readmissions. The aims of this study were to evaluate variations in the quality of transitions across groups of patients and across hospitals with high and low readmission rates and to study the impact of transitions on postdischarge outcomes. Methods A multicenter cohort study was conducted at 12 Flemish hospitals between June 2013 and September 2015 to examine transitions for patients with heart failure, pneumonia, or total hip/knee arthroplasty. Hospitals with high and low readmission rates were selected based on readmission rates in 2008. The quality of the transitions was assessed based on readiness for discharge, patient education, general practitioner contributions to the discharge process, and timeliness and completeness of discharge summaries. Results A total of 233 patients were included in the study. Readiness for discharge was better in patients with total hip/knee arthroplasty than in those with heart failure or pneumonia (mean differences 11.1 (95% CI 5.3–16.9) ( p = 0.001) and 5.8 (95% CI 1.2–10.5) ( p = 0.016), respectively). Heart failure patients had better readiness scores in low readmission rates than in high readmission rates hospitals (mean difference 13.5 (95% CI 2.5–24.5)) ( p = 0.017). Insufficient timeliness of discharge summaries was a risk factor for postdischarge events (OR 10.564; 95% CI 1.476–75.603; p = 0.019). Discussion To improve the quality of transitions from hospital to home, communication with general practitioner s must occur in a timely manner and with a focus on the continuity of care. Particularly, in patients with complex postdischarge needs, preparing patients for discharge is essential to prevent readmissions.
No takes yet. Share an insight, caveat, or question.
Braet et al. (2016) conducted a cohort in Heart failure, pneumonia, or total hip/knee arthroplasty (n=233). Insufficient timeliness of discharge summaries vs. Timely discharge summaries was evaluated on Postdischarge events (OR 10.564, 95% CI 1.476-75.603, p=0.019).
Synapse has enriched 10 related papers. Consider them for comparative context: