This paper investigates an integrated strategy of inventory control and preventive maintenance for a randomly failing production unit subject to a minimum required availability level. The production unit is submitted to a maintenance action as soon as it reaches a certain age m or at failure, whichever occurs first. A buffer stock h is built up at time A from the start of a production cycle in order to allow a continuous supply of the subsequent production unit at a constant rate during repair and preventive maintenance actions whose respective durations are random. A mathematical model and a numerical procedure are developed to find simultaneously the optimal values of the three decision variables (m*, h*, A*) which minimize the total average cost per time unit and satisfy the availability constraint.
No takes yet. Share an insight, caveat, or question.
Rezg et al. (2008) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: