Answers are grounded in this paper and cite their sources.
Hydrologic, hydraulic, and economic uncertainties impact the economic attractiveness of flood-risk management projects. In particular, uncertainty in the calculation of expected annual damages introduces uncertainty into economic evaluations. This study develops a hypothetical basin to explore the performance of designs identified by different economic-risk decision models. A new decision model includes an explicit quantification of uncertainty in the marginal net benefits and hence in the reliability of net benefits generated by the last increment of a project. Monte Carlo analyses show that the uncertainty in total project benefits may not reveal large uncertainties associated with the last increments of a project. In terms of economic performance of the different descriptions of hydrologic risk, expected probability and traditional maximum likelihood flood-risk estimators are roughly equivalent. The new decision model identified less costly projects that achieved nearly the same average net benefits and had a greater probability of recovering the last dollar spent.
No takes yet. Share an insight, caveat, or question.
Al‐Futaisi et al. (1999) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: