Answers are grounded in this paper and cite their sources.
We compare different multiperiod risk measures taken from the class of polyhedral risk measures with respect to the effect they show when used in the objective of a stochastic program. For this purpose, simulation results of a stochastic programming model for optimizing the electricity portfolio of a German municipal power utility are presented and analyzed. This model aims to minimize risk and expected overall cost simultaneously. (© 2004 WILEY‐VCH Verlag GmbH & Co. KGaA, Weinheim)
No takes yet. Share an insight, caveat, or question.
Eichhorn et al. (2004) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: