Answers are grounded in this paper and cite their sources.
This article investigates a bi-objective scheduling problem on uniform parallel machines considering electricity cost under time-dependent or time-of-use electricity tariffs, where electricity price changes with the hours within a day. The aim is to minimize simultaneously the total electricity cost and the number of machines actually used. A bi-objective mixed-integer linear programming model is first formulated for the problem. An insertion algorithm is then proposed for the single-objective scheduling problem of minimizing the total electricity cost for a given number of machines. To obtain the whole Pareto front of the problem, an iterative search framework is developed based on the proposed insertion algorithm. Computational results on real-life and randomly generated instances demonstrate that the proposed approach is quite efficient and can find high-quality Pareto fronts for large-size problems with up to 5000 jobs.
No takes yet. Share an insight, caveat, or question.
Zeng et al. (2017) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: