Answers are grounded in this paper and cite their sources.
This study considers a single machine group scheduling problem with deteriorating jobs and resource allocation (controllable processing times). The objective is to have the resource availability limited within a given range, and to minimize the maximum completion time (i.e. the makespan). For two special cases, it is proved that the problem can be solved in polynomial time. For the general case, an heuristic algorithm and a branch-and-bound algorithm are proposed. Computational results show that the proposed heuristic algorithm is generally effective.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2018) studied this question.