Answers are grounded in this paper and cite their sources.
A novel intra-task voltage-scheduling algorithm controls the supply voltage within an individual task boundary. By fully exploiting slack time, it achieves a high-energy reduction ratio. Using this algorithm, a software tool automatically converts an application into a low energy version.
No takes yet. Share an insight, caveat, or question.
Shin et al. (2001) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: