SUMMARY In this paper, a method based on a new approach has been given for tackling the scheduling problem usually encountered when a number of products are manufactured on a single machine on a repetitive basis. The method provides a near optimum schedule for multi-product single machine systems, and is eminently suitable for those systems where machine utilization is high. An example has been solved for illustrating the method.
No takes yet. Share an insight, caveat, or question.
S.K. Goyal (1975) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: