This paper describes an easy method of determining the economic manufacturing schedule of a multi-product single machine system on a repetitive basis. An example has been solved to illustrate the method reported in the paper.
No takes yet. Share an insight, caveat, or question.
S.K. Goyal (1973) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: