Answers are grounded in this paper and cite their sources.
Bolted connections are being considered as an assembly method for the foundations of floating offshore wind turbines. A clear benefit of this method is the short assembly time of these foundations compared to welding. However, some concerns around corrosion, fatigue, and the ability of bolted connections to maintain preload remain. This review found that conventional ring flanges may not be suitable for the assembly of floating foundations, mainly due to the risk of bolt loosening and reduced fatigue life. However, the C1 Wedge Connection is an innovative bolted connection that has shown its ability to retain bolt preload during tests. Likewise, the Compact Flange Connection has shown its ability to retain preload without requiring maintenance during operational stages and furthermore, has a long and successful track record in offshore oil and gas applications. This review revealed several research gaps related to the use of bolted connections for the assembly of floating wind turbine foundations. These include: a lack of research on the effects of bolt loosening; dynamic loads and shear forces on bolted connections and their effect on fatigue life; structural health monitoring methods of bolted connections; and the health and safety of technicians in confined spaces with difficult accessibility. The Compact Flange Connection is perhaps the best suited bolted connection for the assembly of floating foundations. However, more research, and crucially, successful offshore demonstrations will be essential to increase confidence in the suitability of bolted connections for the floating offshore wind industry.
No takes yet. Share an insight, caveat, or question.
Aimee et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: