Answers are grounded in this paper and cite their sources.
An integrated approach to the problem of allocation of inspection effort in multistage production systems is presented. The problem addresses multiple inspection operations, different disposition policies and inspection, production and repair errors. Quality and cost transfer functions are developed to model production operations and different types of inspection operations in a unified manner and to facilitate the recursive computations required to evaluate alternative system configurations. We formulate the combined inspection location and sequencing problem as a nonlinear mathematical programming problem and solve it with a branch and bound technique, using a heuristic to generate a feasible solution and upper bound. These developments are illustrated with a numerical example.
No takes yet. Share an insight, caveat, or question.
Raz et al. (1991) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: