Answers are grounded in this paper and cite their sources.
In ever bigger quest to maximal efficiency, this article wants to show a route for Total Production Maintenance (TPM) at maximal efficiency. By bringing the digital twin into the real world, this essay wants to show how a digital twin can be used as a reliable basis for controlling the running line. But before the digital twin can be used at its maximal potential, a common ground must be defined not only in calculating Overall Equipment Effectiveness (OEE), but also in categorizing TPM tasks according to 3 factors of OEE. The paper outlines the foundations of a new concept that has not been applied in practice.
No takes yet. Share an insight, caveat, or question.
Tamás et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: