Answers are grounded in this paper and cite their sources.
An optimal design of CUSUM control charts is reviewed. Plots of chart parameters are given which enable the chart parameters of an optimal CUSUM chart to be determined easily. Both the CUSUM charts with and without head starts are considered.
No takes yet. Share an insight, caveat, or question.
F. F. Gan (1991) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: