This paper presents a generalized periodic imperfect preventive maintenance (PM) model for a system with age-dependent failure type. The imperfect PM model proposed in this study incorporates improvement factors vis-a-vis the hazard-rate function, and effective age. As failures occur, the system experiences one of the two types of failure: type-I failure (minor), and type-II failure (catastrophic). Type-I failures are rectified with minimal repair. In a PM period, the system is preventively maintained following the occurrence of a type-II failure, or at age T, whichever takes place first. At the N th PM, the system is replaced. An approach that generalizes the existing studies on the periodic PM policy is proposed. Taking age-dependent failure type into consideration, the objective consists of determining the optimal PM & replacement schedule that minimize the expected cost per unit of time, over an infinite horizon.
No takes yet. Share an insight, caveat, or question.
Sheu et al. (2009) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: