Answers are grounded in this paper and cite their sources.
In Korea, the use of BIM in designing is consistently increasing, and in line with current situation, it is necessary to find a method that can interconnect the existing fire simulation and BIM. In this study, we suggested an interworking method of Add-on Program that is possible link with BIM, and conducted a case study with existing programs. Further, it was tested by comparing the temperature at any point. Comparing the result of maximum temperature, a difference of approximately 0.3 ℃, 2.4 ℃, and 17 ℃ was observed in case of T-1, T-2, and T-3. The reason of difference was that a human user cannot create the coordinates like a computer when developing the fire model. In the future, there will be consideration to conduct more case studies.
No takes yet. Share an insight, caveat, or question.
Lee et al. (2020) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: