In order to control or reduce the ground vibrations caused by underground blasts in Malmberget mine, a number of blast tests were carried out during production blasts and a series of single shot waveforms were obtained. Then the single shot waveforms from the same ring or different rings were analysed and compared with each other. The results showed that the single shots are reproducible, meaning that the ground vibrations caused by underground blasts can be controlled by means of the interference of the vibration waveforms measured. Finally, a formal test using electronic detonators and employing an optimum delay time of 8 ms was done in production. The test for an 11-borehole ring shows that the maximum vertical ground vibrations are reduced to the maximum vertical vibrations of a single shot. Particularly, the total vibration history for the 11-borehole-ring blast is shortened to about 200 ms over a velocity of 2 mm/s. However, the total vibration history of a normal production blast of 11-borehole ring is always 1400 ms over a velocity of 2 mm/s, namely the total vibration time of a production blast can be reduced to one seventh of that of the common production blasts by using the vibration control method. This indicates that the vibration control method introduced in the paper is feasible for underground mining blasts.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2004) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: