Answers are grounded in this paper and cite their sources.
The paper focuses on multi-stage production systems. If such a system is of the more general type than a production line and many products have to be manufactured according to different technological sequence restrictions then two problems arise: (1) scheduling and (2) sequencing. The formulation of that problem requires the simultaneous consideration of the scheduling and sequencing aspect. The paper integrates these two functions into one single model using zero-one programming.
No takes yet. Share an insight, caveat, or question.
Christoph Haehling von Lanzenauer (1970) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: