Answers are grounded in this paper and cite their sources.
Scheduling in a flexible manufacturing system (FMS)must take into account the shorter lead-time, the multiprocessing environment, the flexibility of machine tools, and the dynamically changing states. The scheduling approach described in this paper employs a knowledge-based system to carry out the nonlinear planning method developed in artificial intelligence. The state-space process for plan-generation, by either forward- or backward-chaining, can handle scheduling requirements unique to the FMS environment. A prototype of this scheduling system has been implemented on a LISP machine and is applied to solve the scheduling problem in flexible manufacturing cells. This scheduling method is characterized by its knowledge-based organization, symbolic representation, state-space inferencing, and its ability for dynamic scheduling and plan revision. It provides a foundation for integrating intelligent planning, scheduling, and machine learning in FMSs.
No takes yet. Share an insight, caveat, or question.
Shaw et al. (1989) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: