This is the authors' abstract. We don't add key points for this paper.
In distribution networks with high penetration of distributed generators (DGs), traditional fault reconfiguration strategies often fail to achieve maximum load recovery and encounter operational stability challenges. This paper proposes a novel two-stage fault reconfiguration strategy that addresses both the fault ride-through capability and output uncertainty of DGs. The first stage introduces a rapid power restoration reconfiguration model that integrates network reconfiguration with fault ride-through, enabling DGs to provide power support to the distribution network during faults, thereby significantly improving the recovery rate of lost loads. An AdaBoost-enhanced decision tree algorithm is utilized to accelerate the computational process. The second stage proposes a post-recovery optimal reconfiguration model that uses fuzzy mathematics theory and the transformation of chance constraints to quantify the uncertainty of both generation and load, thereby improving the system’s static voltage stability index. Case studies using the IEEE 69-bus system and a real-world distribution network validate the effectiveness of the proposed strategy. This two-stage strategy facilitates short-term rapid load power restoration and enhances long-term operational stability, improving both the resilience and reliability of distribution networks with high DG penetration. The findings of this research contribute to enhancing the fault tolerance and operational efficiency of modern power systems, which is essential for integrating higher levels of renewable energy.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
He et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: