Answers are grounded in this paper and cite their sources.
This paper presents an efficient approach to short term resource scheduling for an integrated thermal and photovoltaic-battery generation. The proposed model incorporates battery storage for peak load shaving. Several constraints including battery capacity, minimum up/down time and ramp rates for thermal units, as well as natural photovoltaic (PV) capacity are considered in the proposed model. A case study composed of 26 thermal units and a PV-battery plant is presented to test the efficiency of the method.
No takes yet. Share an insight, caveat, or question.
Marwali et al. (1998) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: