Answers are grounded in this paper and cite their sources.
This paper reviews models used in the electricity supply industry for appraising investments, and presents some extensions. Quantities demanded and the prices of inputs and outputs are assumed to be exogenous, and the models search for investments having the lowest costs. Optimization is over several time periods. Typical decision variables considered are: choice of fossil, nuclear, single- or multipurpose hydro plant; locations of plants; directions of electrical energy transport (interconnection); timing of investments; replacement; and in all cases the optimum mode of system operation (including hydro storage policy). These variables may be analyzed by linear, non-linear, and dynamic programming as well as other methods. Both global models and optimization treatment of subproblems are reviewed.
No takes yet. Share an insight, caveat, or question.
Dennis Anderson (1972) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: