This paper is Part II of a two-part paper that develops a multi-period chance constrained optimal power flow model to schedule generation and reserves from both generators and aggregations of uncertain but controllable electric loads. Part I developed the formulation and solved the problem using a scenario-based method. In Part II, we assume that all uncertainties follow multivariate normal distributions, allowing us to reformulate the constraints analytically to obtain a deterministic formulation that can be solved faster and with less need for real data than the scenario-based method in Part I. We test the approach on a modified IEEE 30-bus system and compare the solutions, empirical reliabilities, and computational requirements to those of the scenario-based method. We find that the analytical reformulation solved using a cutting plane algorithm requires less computational time than the scenario-based method. Additionally, its solution is less costly and less conservative; however, its empirical reliability is lower, though still close to the desired reliability.
No takes yet. Share an insight, caveat, or question.
Li et al. (2017) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: