Answers are grounded in this paper and cite their sources.
Structural modeling study demonstrates effective retrofitting protocols for excessive creep deflection in ageing prestressed bridges, highlighting external prestressing and structural modifications.
Ageing first-generation segmental bridges, built by cast-in-place balanced cantilevering and prestressed with rigid bars, were widely built in Italy and Europe between the 1960s and 1980s. Characterised by T-frame schemes with midspan hinges or simply supported drop-in spans, these bridges are highly susceptible to long-term, time-dependent deflections. Many have now reached or exceeded their nominal service life while remaining critical to road networks, creating an urgent need for reliable assessment and effective retrofit strategies. Creep-induced deformations frequently exceed Serviceability Limit State thresholds and may also compromise Ultimate Limit State performance. This study investigates the mechanisms underlying excessive deflections, focusing on concrete creep and prestressing losses associated with original design and construction methods. A retrofit strategy is proposed, including external prestressing, partial unloading of the drop-in span, and, where feasible, static scheme modifications to promote arch-frame behaviour. The methodology is validated on a historic Italian bridge, with stress distribution and deformed configurations assessed through staged-construction analyses incorporating different creep models. Additional case studies demonstrate the broader applicability of the approach and identify the key parameters controlling long-term structural degradation and the effectiveness of retrofit interventions.
No takes yet. Share an insight, caveat, or question.
Granata et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: