This is the authors' abstract. We don't add key points for this paper.
Fusion by Advanced Superconducting Tokamak (FAST) is a project being proposed as a facility for R&D, testing, and demonstration of systems integration for a deuterium–tritium (DT) fusion energy reactor. The required specifications for FAST are: DT fusion power of 50– 100 MW , neutron wall loading of 0.3– 1 MWm − 2 , discharge duration of 1000 s, and full-power operation lifetime of 1000 h. A quasi-zero-dimensional parameter survey has been carried out to find the parameter region necessary to satisfy the above specifications with the minimum device cost. It was found that a low aspect ratio ( A ∼ 2.3 ), compact (major radius ∼ 2.0 m ) tokamak with high temperature superconductor magnets and neutral beam injection power of about 50 MW (with the energy of 500 keV) offers a possible design point. A time-dependent transport analysis was performed to confirm accessibility to such an operating point and to evaluate the required flux swing for the central solenoid.
No takes yet. Share an insight, caveat, or question.
Ejiri et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: