Answers are grounded in this paper and cite their sources.
The ramp events of photovoltaic (PV) generation will cause severe voltage variations in a distribution network. To address this issue, a two-stage robust optimization based intra-hour dispatch model is proposed for the coordination of the on-load tap changer and smart PV systems. Hence, the distribution network security can be ensured by adjusting substation voltage and controlling PV systems. Case study on 33-bus system verifies the effectiveness of the proposed model.
No takes yet. Share an insight, caveat, or question.
Li et al. (2017) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: