Answers are grounded in this paper and cite their sources.
This study examines the techno-economic feasibility of a renewable-based baseload power system designed to supply continuously 1 GW_e of renewable electricity to data centers in Nordic environment. This off-grid system relies specifically on wind and solar power, but also battery energy storage system, and a backup power plant are used to meet the constant energy demand throughout the year. The system configuration is optimized by minimizing the levelized cost of electricity (LCOE) through a particle swarm optimization method. The study evaluates two distinct operational scenarios: a full baseload power supply (8760 h/a) and a scenario with full load hours of at least 8000 h/a, mirroring the operational characteristics of nuclear power plants. The results indicate that the most cost-effective approach necessitates considerable over-dimensioning of renewable generation assets, further demanding substantial energy curtailment. The dependence on backup generation and, by implication, the emerging costs, can be reduced remarkably on the 8000 h/a scenario (15%-24% lower costs). The location of the variable renewable generation assets affects remarkably the cost of supplied electricity, as the LCOE at the most favorable location can be even 24% lower than at the least favorable location. The LCOE for the continuous full-load operation results approximately to 100 €/MWh_e and drops below 80 €/MWh_e in the 8000 h/a scenario in the most favorable location. Especially compared to new nuclear power plants under construction, these results highlight that renewable baseload system remains cost-competitive, even under less-than-optimal conditions, strengthening the case for renewable baseload solutions also in the Nordics.
No takes yet. Share an insight, caveat, or question.
Salmelin et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: