Why the study?
Does a demand management strategy including a 6-month minimum re-testing interval reduce unnecessary NT-proBNP requests in primary and secondary care?
Does a demand management strategy including a 6-month minimum re-testing interval reduce unnecessary NT-proBNP requests in primary and secondary care?
Implementing a 6-month minimum re-testing interval and clinical engagement significantly reduces unnecessary NT-proBNP testing and associated healthcare costs without adverse clinical incidents.
Answers are grounded in this paper and cite their sources.
May support cost-saving NT-proBNP demand management; leaves open effects on outcomes and generalizability.
The number of laboratory tests performed in the UK is steadily increasing (average 8-10% year-on-year increase).1 Funding for these tests is not increasing at the same rate. Hence, considerable interest has focused on managing the demand for pathology tests. A wealth of data now exist highlighting a significant degree of unnecessary requesting,1-6 with commonly requested tests imposing a major cost burden upon healthcare systems. Recently, we reported on a previous success in implementing a demand management strategy to reduce inappropriate C-reactive protein testing,7 highlighting savings that can be made by undertaking these kinds of projects. Serum Brain Natriuretic Peptide (BNP) and the N-Terminal BNP pro-hormone (NT-proBNP) are other tests showing marked year-on-year increases in most UK laboratories (Figure 1; Walsall NT-proBNP data). The UK National Institute for Health and Care Excellence (NICE) has recommended using BNP or NT-proBNP measurements for diagnosis of heart failure (CG187 for acute heart failure (AHF)8 and CG108 for chronic heart failure (CHF)).9 In patients presenting with newly suspected AHF, BNP <100 pg/mL or NT-proBNP <300 pg/mL rules out this diagnosis.8 Single time point measurement of BNP/NT-proBNP is considered acceptable by NICE for diagnosis.9 The UK Association for Clinical Biochemistry (ACB) Minimum Re-testing Interval (MRI) Project10 recommended measuring BNP/NT-proBNP only once for primary care heart failure triage. Repeat measurements are only considered necessary if there is change in clinical presentation where heart failure had previously been excluded. Walsall Healthcare NHS Trust provides acute hospital and community health services for people living in Walsall and the surrounding areas, serving a population of ~270 000. Seeing the monthly number of requests significantly increasing, we undertook a 4-stage approach to manage demand for this test: (1) an audit of all NT-proBNP requests for 1 year (including number of tests, location/identity of requestors, number of repeat requests/interval); (2) discussion with the local Heart Failure Lead clinician, consultants and service users; (3) implementation of an agreed strategy in line with national guidance; 4) re-audit after the interventions. What we did: An audit of all NT-proBNP requests (from primary and secondary care) was undertaken during a 1-year period (01/01/2015–31/12/2015). What we found: The laboratory analysed 5916 tests in this period. The assay cost for each test was £16.88 (at the time of analysis), equivalent to ~£100 000 per annum based on reagent costs alone. Requests came from various locations, including Primary Care (Table 1). Seven hundred and fifty-one patients had more than one NT-proBNP request during the 1-year period examined, totalling 984 repeats. One person had 7 requests, five had 6 requests, eight had 5 requests, 34 had 4 requests, 116 had 3 requests and 587 had 2 requests. In one example, a 50-year-old patient had 5 tests (in 2015), and when checked further, had 11 requests made across 2015–2016 with not a single result abnormal (>300 ng/L) and no diagnosis of heart failure made. A correlation (Spearman rho = 0.12; P < .0001) was seen between the number of repeats in individuals and the levels of NT-proBNP recorded. Six hundred and eighty-two patients during 2015 had repeat NT-proBNP tests performed within 6 months (182.5 days) of a previous test. In total, this amounted to 887 tests at a reagent cost of £14,973. The mean time interval between NT-proBNP requests for all repeats was 67.7 days. The mean interval between requests for patients with 1, 2, 3, 4, 5 and 6 repeats was 72.2, 49.5, 63.6, 68.7, 40.2 and 6.0 days, respectively. The audit provided evidence of inappropriate testing and informed subsequent discussion with the Heart Failure Team. It was clear that changes were required to help manage demand for NT-proBNP and bring testing in line with NICE guidelines for heart failure. What was actioned: Proving unnecessary requesting is a difficult undertaking. However, it was agreed that action was needed to: (1) advocate adherence to local and national guidance and ensure appropriate NT-proBNP requesting based on a likely diagnosis of heart failure (via a clarification question in the ICE test order communications system used by primary and secondary care) and (2) prevent unnecessary repeat NT-proBNP tests (unless first discussed with the Heart Failure Team as the guidelines recommend single measurement only). Typically, NT-proBNP is not used for monitoring unless there are confusing clinical signals as to whether individuals are getting better and this happens in <2% of heart failure patients. This is in accordance with European and American cardiology guidance, and NICE.9, 11-14 As such, we set a 6-month-rule for repeat NT-proBNP tests instead of completely blocking any repeats. Initially, we had considered blocking any repeat within a year, but after debating this with service users, we compromised to 6 months. Moreover, if a patient had an acute cardiac event, where a repeat NT-proBNP may be considered useful, a repeat could still be requested through the Cardiology/Critical Care teams that were not subject to these blocks, or the laboratory could be contacted directly to ask for it to be done. Findings were presented at a Trust Audit meeting and a hospital-wide medical educational event (Spring 2016) and were used as opportunities to improve heart failure awareness. Based on the first audit, NICE guidance and discussion with the Heart Failure Lead, it was decided that: (1) there would be a statement on the ICE requesting system when the test is selected stating: “This test should only be requested when a diagnosis of heart failure is likely” (Trust Heart Failure guidelines to help support this clinical decision were also circulated); and (2) NT-proBNP requests would be rejected automatically by the laboratory information management system (LIMS; Clinisys Winpath) if repeated within 6 months with a comment: “Repeat NT-proBNP request. If a further test is required, please agree this with the Heart Failure Team first (contact telephone extension), before contacting the laboratory”. In July 2016, all service users were given advance notice of the change through an emailed letter outlining that these proposals would come into effect from August 2016. To ensure that we implemented this safely, time was allowed for feedback from users, particularly relating to the MRI for repeat tests of 6 months. Restrictions were not applied to requests from Cardiology and Critical Care locations/consultants, including the Heart Failure Team. After further feedback (final notification: 10/08/2016), changes were implemented on 28/08/2016. Re-audit: To review the impact of this change, a re-audit of annual NT-proBNP requests was recently completed using data collected from the LIMS. The total numbers of requests were assessed from data over a period covering 01/01/2009–30/06/2017 (Figure 1). The number of requests had increased year-on-year from 2009 (1214 requests) up to a peak in 2015 (5916). With the intervention reported here, the number of requests dropped to 5541 in 2016 and are on course for ~5470 in 2017 (extrapolated from first 6 months data for 2017), which is a 6.34% and 7.54% reduction, respectively, from the peak of requests in 2015. 3.19% and extrapolated 8.81% of tests were blocked by the 6-month-MRI in 2016 and 2017, respectively. The 2017 data assume the same rate of increase over time. With regards to the total number of tests performed, this meant a reduction overall of 9.33% and 15.69% in 2016 and 2017, respectively. This is a reversal of the trend which saw continual increases prior to intervention, something our managed service contract provider has acknowledged and stated was in contrast to what they were seeing elsewhere (Mr Alex Jones, Roche Diagnostics; personal communication). Post-intervention (of the LIMS 6-month-MRI/order communications statement) monthly NT-proBNP tests (period: September 2016-June 2017) were significantly lower than pre-intervention (period: September 2015-June 2016) (two-tailed Mann-Whitney U-test: P < .01); using a second pre-intervention period before any clinical engagement had started (September 2014-June 2015), this difference was even more significant (P < .001). The fall in NT-proBNP requesting cannot be entirely explained by the introduction of the MRI but is also the consequence of clinical engagement, clear guidance and communication, which included discussion on the consultant email-base, Grand Round presentations, clear laboratory reporting comments, letters to service users prior to implementation of the computer rule and the introduction of the statement on the ICE requesting system to challenge this testing. While there are resource implications to devising and implementing the demand management scheme described here, we assert that the savings outweigh the staff time required once the system has been embedded. Though pilot and early studies promised benefits of BNP testing in reducing mortality and hospitalisation, larger randomised trials did not reach statistical significance. One of the larger trials (TIME-CHF 12) of ~500 patients in 15 centres with systolic heart failure followed over 18 months suggested some trends in reduction of hospitalisation and mortality with BNP guidance, but these were seen only in patients aged <75 years. Patients were selected from individuals symptomatic with left ventricular systolic dysfunction (LVSD) excluding renal impairment, valvular heart disease, acute coronary syndromes in the past 10 days, BMI >35, and life expectancy <3 years. Our referred patients, where BNP is requested, are unselected. Though patients treated by the heart failure service are individuals with LVSD, cut offs of left ventricular ejection fraction are higher, patients with renal impairment and raised BMI are not excluded and a large number of patients have a low life expectancy. Importantly, we have not had any clinical incidents or complaints in relation to this change. The number of telephone calls to the laboratory requesting the test still be done and the rule over-ridden was negligible (<1% of tests), as were requests to the Heart Failure Team to discuss re-ordering. Quantifying the reduction seen at £16.88 per test, based on reagent costs alone, resulted in an annual saving of £9318 in 2016 (rule only introduced in the last 4 months of 2016) and an estimated annual saving of £15 665 for 2017 (full cost of the test is cited by our service as £37.73). To conclude, if implemented in all laboratories across the UK, an intervention as described here could result in significant savings for the NHS as a whole. I would like to acknowledge Mr Steve Harris for his assistance in providing the data. None to declare.
No takes yet. Share an insight, caveat, or question.
Livingston et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: