Simulation study demonstrates reliable risk-window planning in HVDC-connected renewable bases, indicating safer candidate selection with reduced replay requirements.
Planning HVDC-connected renewable energy bases is constrained by the cost of full 8760 h multi-scenario replay and the risk that temporal reduction obscures coupled renewable scarcity, ramping stress, storage depletion, and delivery recovery. This study develops an auditable and extensible workflow in which a seven-dimensional coupled state generates continuous preparation–shock–recovery risk windows that feed replay-based metric diagnosis, surrogate-guided query ordering, and replay-authoritative decision release. Decision-LCB prioritizes a finite 600-vector pool using exact investment costs, predicted variable costs, and heuristic tree dispersion; an information firewall, a separate 120-vector calibration pool, and a replay-all fallback prevent unreplayed predictions from certifying feasibility. Decision-LCB recovered the finite-pool oracle in 60/60 original cases and 59/60 pre-label-frozen follow-up cases; it recorded 0/60 empirical false stops in each layer and achieved 60/60 within-tolerance outcomes and 60/60 gate passes in the follow-up. Ridge cost-greedy recovered 60/60 follow-up oracles with the same pass and false-stop counts, supporting cost-aware acquisition but not a unique LCB advantage. A passing gate requires 360 total vector replays, 40% fewer than full enumeration, whereas failure requires 720, 20% more. Simultaneous lower-bound coverage of the 360 sealed candidates was 0/60, and the measured local implementation increased online and end-to-end wall-clock times by 346.75% and 408.53%; therefore, neither simultaneous regret protection nor runtime improvement is claimed. The principal contribution is therefore architectural rather than algorithm-specific: alternative acquisition policies and higher-fidelity network-constrained or project-specific replay engines can be integrated while the information firewall, chronological replay authority, and replay-all safeguard remain fixed. This modularity provides a route to larger finite design spaces, richer technology portfolios, and broader scenario sets when the simulator cost dominates workflow overheads, while measured-data and deployment-specific validation remain necessary.
No takes yet. Share an insight, caveat, or question.
Qin et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: