Answers are grounded in this paper and cite their sources.
This study proposes a design–build–operate energy information modelling (DBO-EIM) infrastructure to allow users to deploy the design-stage building energy model for model predictive control (MPC) system in the building operation. A newly constructed office building is studied as a test bed. An EnergyPlus model-based predictive control (EPMPC) system is designed and simulated in the Matlab/Simulink environment within the DBO-EIM infrastructure. EPMPC aims at minimizing heating, ventilation, and air conditioning energy consumption while maintaining occupant thermal comfort. Compared to the baseline rule-based control system, EPMPC demonstrates a 28.9% energy reduction in one-week simulation in the heating season and 2.7% energy reduction in one-week simulation in the cooling season. The comfort constraint is met during more than 90% of the simulated hours. The study demonstrates one significant contribution of the DBO-EIM infrastructure that a design-stage EnergyPlus model can be integrated in an MPC system and the preliminary simulation results are satisfactory.
No takes yet. Share an insight, caveat, or question.
Zhao et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: