Answers are grounded in this paper and cite their sources.
• Determine the period between measurements in non-continuous predictive maintenance. • The Time Interval Between Measurements ( TIBeM ) is calculated dynamically. • The TIBeM changes depending on the criticality, reliability and machine status. • Current machine status is based on automatic assessment of the measurements. • The TIBeM can be immediately implemented in the ERP system of the plant. In practice, on a large number of machines in industrial plants, predictive maintenance relies on periodic measurements to diagnose the condition of the equipment, rather than continuous monitoring of vibrations. In those cases, choosing an appropriate period between measurements is the key to success. Setting a long period implies taking a serious risk of breakdown, while a very short time interval between measurements can unnecessarily increase the costs of the maintenance plan. This work shows a methodology to determine and manage this Time Interval Between Measurements ( TIBeM ) dynamically adapted to each machine and situation. Depending on the criticality of each machine and its reliability, more specifically, its present diagnosed functional condition and the history of failures and measurements, the most appropriate TIBeM is recalculated each time a new measurement and diagnostic is performed. The described method has been implemented and validated in a large process plant and has led to a considerable improvement in costs and the management of its predictive maintenance plan.
No takes yet. Share an insight, caveat, or question.
Hijes et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: