Answers are grounded in this paper and cite their sources.
Dams have a profound influence on fluvial processes and morphology. Reservoirs formed by dams drown river channels and trap sediment. Downstream reaches respond to altered flow regimes and reduced sediment supply in varied ways (Williams and Wolman 1984, Collier et al. 1997) that are difficult to predict, although common responses include erosion and lowering of the channel bed (incision) and development of a coarse-grained surface layer (armor) in the riverbed downstream of a dam. As dam removal continues to gain momentum as a restoration strategy, understanding how a river changes when a dam is removed is becoming increasingly important. Because few detailed geomorphic studies of dam removal have been conducted, however, there is little direct observational basis for predicting the geomorphic effects of dam removal. Furthermore, rivers are complex and fluvial processes often occur over decades or centuries, so predictions are inherently uncertain. Fortunately for researchers, the processes associated with dam removal also occur naturally. For example, after dam removal the sediment fill in an impoundment is likely to become incised, and an equilibrium channel with a new floodplain is likely to form as sediment evacuated during incision increases the sediment supply to downstream reaches. Natural processes related to incision, floodplain formation, equilibrium channel development, and increased sediment supply have been widely studied by geomorphologists and engineers, providing useful conceptual models for evaluating the geomorphic effects of dam removal (Doyle et al. in press). These models can rarely be quantified, however, and in many cases the appropriate model for a particular situation may not be apparent before dam removal. Thus future research will need to concentrate on discriminating among the myriad possible geomorphic responses to dam removal and improving the quantitative basis for predictions. The engineering design and implementation of dam removal plans can profoundly influence the subsequent geomorphic evolution of the impoundment, as well as the extent and nature of sediment impacts downstream of the dam. Important design considerations include strategies to stabilize or remove sediment fill above the dam, the timing and nature of the actual dam removal, and the extent to which the removal follows engineering design criteria. A variety of strategies exist for minimizing erosion of the sediment fill above dams. Although it may be expensive, removing sediment fill behind the dam may be useful in some instances (Smith et al. 2000). Removing sediment is a particularly attractive alternative when dam fill sediments present an extreme hazard, or when other exceptional factors can justify the expense involved. Furthermore, the sediment that makes up the fill may consist of sand and gravel (Egan and Pizzuto 2000, Wilcox et al. 2000) that could be sold as aggregate for concrete or for construction fill (assuming that sediments are not contaminated). Regrading, revegetating, and riprapping (i.e., strengthening with a layer of stones) of the exposed dam fill have also been proposed as means of reducing the extent and rate of erosion (Harbor 1993, Kanehl et al. 1997). The engineering design of the actual dam removal may have a significant influence on sediment-related impacts. In many cases, dams are breached only over short sections to allow the reservoir to drain before removing the remainder of the dam (Egan and Pizzuto 2000). Drawing down the reservoir before removal can achieve the same effect, in addition to allowing fine-grained reservoir sediments to consolidate and strengthen (Kanehl et al. 1997). To minimize the potential impacts of eroded reservoir sediments downstream of high dams on the Elwha River in Washington, Harbor (1993) advocated “controlled lowering” of the dams on the Elwha River in Washington, in which removal would occur in stages. It is also important for engineering designs to be specific and for the removal process to be monitored by qualified inspectors. When the Manatawny Dam in Pottstown, Pennsylvania, was removed in August 2000, the contractor was simply directed to remove the dam: No detailed specifications for removal were given to the contractor, and the dam removal process was not monitored by suveyors. After the dam had been “removed,” surveys revealed that the contractor had removed only half of the 2-meter (m) height of this dam. The remaining 1 m of the dam consisted of large blocks that could not be transported by the stream. These blocks made erosion at the dam site impossible, in addition to controlling the elevation of the streambed above the dam. As a result, the channel upstream did not change initially. In November 2000 the remaining half of the dam was removed, and by June 2001 sand and gravel had accumulated in the streambed above the dam and finer-grained sediments had been swept downstream to expose gravel riffles (steep, rocky sections of the channel with shallow, fast-moving water) (Egan 2001). Such problems may not necessarily be caused by a contractor's negligence. Rather, the desired elevation of the dam site following dam removal may not be explicitly defined or discussed. Indeed, it is an easily neglected concept: What could be simpler than just “removing” the dam? At the Manatawny Dam, the problem was clearly illustrated only following a detailed survey of the longitudinal profile over the dam site. Ideally, the design should have included a target longitudinal profile for the postdam channel, which, when projected over the dam site, would have indicated the appropriate elevation to which the contractor should have excavated. Upstream from the dam, geomorphic processes should follow a coherent sequence (figure 1). First, the channel will incise through the sediment fill. Bank failures will occur if the channel depth increases above a critical value that depends on the strength of the soil and the detailed geometry of the stream. The additional sediment supplied by bank failures could be used to build floodplains and, ultimately, a new equilibrium channel. The complete sequence will probably require at least a decade and will depend greatly on the mass and grain size of the sediment stored behind the dam. The sediment fill in the impoundment could be incised by a variety of processes that will probably depend on the height of the sediment fill and its grain size (figure 2). In cohesive silt and clay sediments, a vertical headcut (an eroding vertical face in the stream bed) is likely to migrate upstream through the fill (Doyle et al. forthcoming). Sandy fills could be subject to sapping as groundwater emerges at the base of a headcut. Other mass wasting processes related to liquefaction of sandy sediment could also occur, particularly when the reservoir fill is thick. Otherwise, a knickpoint (an abrupt increase in slope) could migrate upstream through a sandy fill. Fills composed of sand or cohesive silt and clay are likely to erode even during low flows, but fills composed of gravel may be incised only during high-flow events that are competent to move coarse sediment (Egan 2001, Doyle et al. forthcoming). For this reason, gravel fills are labeled as “event-driven” in figure 2. Incision rates for removing dam fill sediments are poorly documented. Gerrits (1994) documented 300 m of knickpoint migration in the year following the removal of Musser Dam in Pennsylvania, a 10-m-high run-of-river dam (a small dam that does not significantly influence the water discharge into the stream). Doyle and colleagues (forthcoming) describe the migration of knickpoints following the removal of two low-head dams in Wisconsin, but they do not provide quantitative results. As noted in considerable detail by Doyle and colleagues (forthcoming), field studies of the development of incised channels provide a useful conceptual model of how channels could respond to dam removal (Schumm et al. 1984, Harvey and Watson 1986, Simon 1989a, 1989b, Simon and Hupp 1992). Harvey and Watson (1986) developed a six-stage conceptual model for the evolution of Oaklimiter Creek in northern Mississippi (also summarized by the Task Committee on River Width Adjustment [TCRWA 1998b]) (figure 3). The six stages may be observed at any time along the longitudinal profile of an incising channel, but they also indicate the evolution of individual cross-sections through time. In stage I, the channel slope is steepened above its equilibrium value, but incision has not yet occurred and the banks are stable. During stage II, the channel incises. Stage III is characterized by extensive bank erosion. The additional supply of sediment from the banks causes aggradation of the bed (stage IV), which gradually becomes vegetated (stage V) and ultimately develops into a mature floodplain with an equilibrium channel (stage VI). Monitoring studies of incised channels indicate that the complete sequence occurs over several decades. Because comparable observations of dam removals are lacking, the appropriate time scale for incision and recovery following dam removal is undocumented. However, when describing the geomorphic response of the removal of two small low-head dams in Wisconsin, Stanley et al. (2002) observed “relatively small and transient geomorphic changes in downstream reaches, and apparently rapid channel development to an equilibrium form within the impoundment.” In this case, dam sediments were composed of readily transportable sand, and extensive floodplain development was apparently not required to form an equilibrium channel. If the sediment fill in the impoundment is thin, incision may not occur (figure 2). Draining a wide impoundment may create extensive flat areas upstream with a wide, shallow channel (Egan and Pizzuto 2000). To develop a narrower, deeper equilibrium channel, floodplains may have to form by vertical accretion as sediment is deposited from overbank flows. These processes are well documented in the geomorphic literature (Schumm and Lichty 1963, Allred and Schmidt 1999, Moody et al. 1999). For example, Moody and colleagues (1999) described floodplain development and channel narrowing following a large flood on the Powder River in southeastern Montana. The floodplain, which grew over approximately 20 years, was built by the deposition of decimeter-thick layers of sand and mud when annual or biannual floods overtopped the growing floodplain. After the Manatawny Dam was removed, extensive gravel bars formed. These probably represent the initial stages of floodplain development required to narrow the channel by about 10 m (Egan 2001). The deposition required to accrete the gravel bars far exceeds the volume of erosion at Manatawny Dam, indicating that the primary response to dam removal in this case was deposition rather than erosion and incision. Thus sediment budgets for downstream reaches may need to be reconsidered depending on whether incision or floodplain development is expected to dominate at a particular site. It is often desirable to be able to predict the size and shape of the equilibrium channel that will ultimately form upstream from the dam. Channel width and depth are needed, for example, to design river restoration projects. However, making such predictions is very difficult. Although the dimensions of undisturbed reaches upstream can provide a useful guide (Egan and Pizzuto 2000, Egan 2001), the banks of the channel within the former impoundment will likely have a different sediment and different from any Thus even may not provide an of the equilibrium channel width and depth in the Furthermore, predict the rate of change or during of channel The of Task Committee on River Width Adjustment a useful of Downstream from the dam, the channel will respond to the increased sediment from the eroding as well as to the of a flow Because the volume of sediment supplied by channel incision will with time and channel responses to changes in sediment supply are the and sediment of the channel downstream will be as the fill upstream is removed and stored sediment a equilibrium form should and have developed at least two conceptual models to of bed elevation changes and sediment following a increase in the supply of bed to a stream channel (figure In case, the initial of sediment for example, by the of sediment behind a in a process by et al. in above the is on its upstream and sediment eroded from the of the is deposited in a of bed evolution that a process of from a or of a by is with in which a of bed downstream a in A of processes is also possible (figure Although many geomorphologists have that sediment as and et al. 2001), and and field studies et al. that should For example, et al. a of sediment into an equilibrium gravel channel. The in by (figure et al. were able to observations a model of and sediment extensive and by et al. also the of The erosion of a dam on the River in also was et al. forthcoming). the of and is significant the two models have different for downstream sediment impacts following dam removal. If a bed in sediment impacts could bed on the other create sediment impacts that in with time and impacts could also in response to two For example, have impacts at a particular but the sediment would that and have a process have a time at a particular but impacts at that site could The described above that the of to rivers and do not into factors such as floodplain processes and width they that impacts from bed following dam removal will not influence the channel far Doyle et al. (forthcoming) and Stanley et al. (2002) however, and that downstream of sediment can be significant following dam removal. increase in sediment supply downstream caused by dam removal could have significant impacts at the a is defined as a of stream that several and or or that is 10 to channel in et al. These impacts include of and of coarse-grained riffles by finer-grained and of and studies are particularly for bed processes in of and the indicate that are for rivers from studies that changes in bed and from an increase in sediment supply may occur in a sequence (figure The described by et al. an equilibrium channel with an gravel bed and bars in figure a of sediment that could represent a dam fill (figure and the response of the channel downstream as the was In the was approximately channel and the same height as the equilibrium depth of The transient evolution of the and the downstream was observed for After the sediment from the dam fill had at least m the and riffles by bars and the A bed with sandy the After the bed was but the bars had not after the same of bars and and riffles that characterized the initial equilibrium channel had These observations that the sediment supplied by dam removal could the of the bed at the is by many field studies a in surface grain size in gravel bed rivers that is caused by an increased supply of sediment et al. 1999). During the as the sediment is removed, the bed is by bars and and Although changes were observed in a of in a the time scale for changes in a field situation is difficult to but it is likely to be at least several 2001). at the scale by Egan following the removal of Manatawny Dam some on the nature of the evolution of bars and and Downstream from the dam, riffles were by a of sand, and eroded from the dam fill riffles following dam removal were also noted by Kanehl et al. and Stanley et al. aggradation downstream of removed After of riffles In the impoundment and riffles and a formed during a flood (a flood on will be or only that after the dam was After however, the of the was with a in which and riffles of channel were also deeper in the than in the impoundment These observations that complete development of and riffles in a channel following dam removal could at least several years, depending on the of competent to move the bed sediment. complex responses at the scale are also Gerrits for example, documented sediment in areas and on the floodplain following the removal of Musser Stanley and colleagues (2002) observed following the removal of small dams in could also be stored in areas of low to stream banks et al. models are used to sediment and processes associated with dam removal. These models predict the and water surface elevation for a and to rates of sediment and changes in bed At a on and of at the 2000 of the of predictions on models are in the 2000 of and are also at are The impacts of dam removal are likely to far downstream to require the of rather than complex or of in and For example, Wilcox et al. approximately of the Sandy River in to predict the potential impacts of the proposed removal of Although it would clearly be to represent and in and sediment over such this is the required by or models can predict only changes in grain size and bed elevation in the downstream and are the width of the channel. Furthermore, predictions in the downstream are associated with a that is widely to channel As a result, models predict of grain size and bed of scale or such as bars or be from models however, in river of models were by and and the of will be with the of the of which will on of and and of models have been used in of field studies et al. provide an and studies et al. often with useful results. many of the processes by sediment models are not well For example, for rates of sand and gravel are in 1997). for processes of silt and clay are also 2001). of sand and gravel are very common in and of the sediment of rivers is by the of silt and Furthermore, processes are only models many other important upstream of knickpoints and changes in width to bank erosion or deposition Doyle et al. processes associated with overbank and associated sediment and the influence of on sediment additional to the development and of models is the poorly developed of conceptual models that controlling geomorphic processes 2001). As a result, the processes that should be included in a quantitative model at a particular site are not well observations are also to the processes that will probably occur during particular dam removal 2001). It is difficult to provide quantitative of the effects of dam removal a model if the processes by the model be before a dam is to the effects of dam removal will require a 1 some of a research that could achieve this need is to the to develop and conceptual models that will indicate the processes controlling the evolution of the river following dam removal. will require observations from dam removal a wide variety of with dam fill sediment impoundment and a of other Because it is to a large of dam removal in engineers, and will need to develop rapid for of dam removal processes through a should also develop models to the processes by conceptual Although models do not include many the rapid development of and the of should allow development of useful The of models that models will be to provide quantitative predictions to guide If models are to be and should have in or other models could be useful for improving conceptual of dam removal processes and models models have useful in many areas of fluvial evolution and the development of sediment the evolution of sediment et al. 2001), the development of in gravel bed rivers et al. and the evolution of channels and 1997). models could provide a means of dam removal processes that be by field models have significant processes or sand often be of the surface of the grain are difficult to create and scale in the and scale models represent important effects caused by in the the geometry of scale models does not to field conceptual and models of and geomorphic processes will not also need predictions of river and sediment processes to predict changes in processes following dam removal. However, the nature and scale of geomorphic predictions that are useful to are not necessarily that geomorphologists are likely to For example, a model used by an or predict the grain size of the bed or even the extent of bed processes be to the of silt and clay in the that has little from geomorphologists and To the of geomorphic predictions for a is to develop geomorphic and will require a and geomorphologists from initial design to model development and To gain in the and of studies are A of the removal of a dam on Manatawny Creek in Pottstown, Pennsylvania, a useful 2001). These studies will be and and only a small of such can be However, they represent the only means of evaluating and of understanding the effects of dam removal on fluvial and research on fluvial processes many useful models for evaluating the geomorphic effects of dam removal. of the evolution of incised knickpoint and headcut floodplain and channel bank erosion and channel the of sediment the of the of of grain in gravel bed and the development of provide into potential of channel evolution following dam removal. Upstream from the dam, geomorphic processes should be by evolution of the channel as it into the sediments in the studies of the evolution of incised channels several stages that will ultimately to development of a new equilibrium channel. The initial stages by bank erosion and aggradation of the bed and floodplain If the impoundment little sediment and is significantly than equilibrium channels upstream and downstream of the dam, the primary processes above the dam are likely to be deposition and floodplain construction (Egan rather than erosion and incision. Downstream from the dam, geomorphic processes should be by fluvial responses to sediment in the field and in that the dam fill will not migrate downstream as a coherent but is likely to in to sediment impacts that with the time removal and the from the dam. sediment supply at the scale could and and sediment on in and along the banks is also The time scale for recovery from downstream transient sediment impacts is difficult to predict, but the that or decades may be Although a variety of useful models exist for predicting the geomorphic effects of dam removal, are to be research is to the geomorphic processes that are likely to dominate different develop conceptual and geomorphic and and dam removal in detail to and quantitative The geomorphic effects of dam removal can be significantly by different strategies of and The removal process can be and to minimize impacts. A variety of are to erosion of the sediment fill and to minimize the effects of increased sediment supply restoration strategies could increase the rate of recovery above and the dam. research should be to provide the to guide so that can be made as to whether dams should be removed, and if and would not have been and were by and of the of the of Natural and would particularly to The for providing that complete this that could to of dam removal effects of geomorphic processes above and removed dams. The time scale is and will from site to site, depending on the size of the dam, the mass of sediment and other 2. the height of a reservoir sediment the grain size of the and different processes of incision. of gravel depends on high-flow incision processes are Incision of sand and of silt and clay do not depend on high-flow but rather on the of removal of fills of sand and of silt and clay are sequence of incised channel evolution Doyle and Stanley after Simon and Hupp Harvey and Watson 1986, and The the critical height at which bank failures occur and and of bed illustrated in The the initial bed The and the of the and the the of the bed et al. of a sediment in an channel. The the longitudinal down the The vertical is the of sediment above the base of the At an equilibrium channel is After a of sediment high and 20 was into the channel. in The have been and the predictions from a model et al. 1997) of a the erosion of a sand and gravel dam fill. The an equilibrium channel with A of sand and gravel a dam was this was to the flow depth in height and approximately channel the recovery of the channel to its initial after These observations were made during two of at by et al.
No takes yet. Share an insight, caveat, or question.
A 2002 study studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: