The paper proposes a stochastic unit commitment (UC) model to realize the low-carbon operation requirement and cope with wind power prediction errors for power systems with intensive wind power and carbon capture power plant (CCPP). A linear re-dispatch strategy is introduced to compensate the wind power deviation from the spot forecast. The robust optimization technique is employed to obtain a reliable commitment plan against all realizations of wind power within the uncertainty set given by probabilistic forecast. The proposed model is validated with IEEE 39-bus system. The advantages of flexible CCPPs are compared to the normal coal-fueled plants and the impacts of robustness controlling are discussed.
No takes yet. Share an insight, caveat, or question.
Li et al. (2015) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: