Answers are grounded in this paper and cite their sources.
This paper evaluates dispatching rules and order release policies in two wafer fabrication facilities (thereafter referred to as ‘fab’) representing ASIC (application specific integrated circuit) and low-mix high-volume production. Order release policies were fixed-interval (push) release, and constant work-in-process (CONWIP) (pull) policy. Following rigorous fab modelling and statistical analysis, new composite dispatching rules were found to be robust for average and variance of flow time, as well as due-date adherence measures, in both production modes.
No takes yet. Share an insight, caveat, or question.
Bahaji et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: