Answers are grounded in this paper and cite their sources.
This paper describes a collaborative effort by industry, government, and academia to evaluate the use of design/information technology (D/IT) and to relate the degree of use to project performance. A detailed statistical analysis of 297 projects in the Construction Industry Institute database is used to produce baseline measures of performance and D/IT use. The relationship between these measures is used to assess the economic value of using the technologies. A set of projects that excelled in the use of D/IT and that scored high on performance measures is then examined. These exemplary projects provide a basis for further in-depth analyses through on-site interviews with key project representatives. The results of this study establish that projects benefit from D/IT use. Both owners and contractors can expect construction cost savings of approximately 4% by increasing the use of D/IT. For owners there is clear evidence of schedule compression as well. Although the statistical analyses do not support schedule compression benefits for contractors, findings from the on-site interviews provide anecdotal support.
No takes yet. Share an insight, caveat, or question.
Thomas et al. (2004) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: