This is the authors' abstract. We don't add key points for this paper.
This paper proposes a statistically feasible joint chance-constrained scheduling framework for integrated power distribution networks (PDN) and district heating systems (DHS). The proposed method constructs data-driven uncertainty sets directly from samples, eliminating the need for prior distribution assumptions. It integrates joint chance-constrained programming (JCCP) with robust optimization (RO) to reformulate the original problem. The resulting model is both tractable and computationally efficient. Additionally, we introduce a novel constraint-specific uncertainty set reconstruction technique. This technique refines the uncertainty set by incorporating optimization-relevant information. It significantly reduces conservatism while ensuring system violation probability requirements. Comparative studies with state-of-the-art uncertainty optimization methods demonstrate the advantages of our approach. The proposed method improves computational efficiency by two orders of magnitude. It also achieves more cost-effective solutions than the best-performing benchmark method.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Zhu et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: